PREPARATION OF BED
Material
used for preparation of bed :
1
. Square tubes
2
.Plywood
3
.Welding rods
4
. colour
5
. Touchwood
6
. Primer ( Redoxide )
7
. Brushes
8
. Thinner
PROCESSES PERFORMED DURING BED PREPARATION :
1 . Cutting
2 . Welding
3 . Grinding
4 . Painting
TABLE : COST
ESTIMATION
Material Cost :
Sr. no
|
Product name
|
Total products
|
Rate
|
Cost (Rs)
|
1
|
2* 1 tube
|
18 ft
|
19.5/ft
|
351
|
2
|
¾ * 3/4 tube
|
12.1 ft
|
8/ft
|
96.8
|
3
|
1.5 * 1.5 tube
|
7 ft
|
25/ft
|
175
|
4
|
Plywood
|
2.42*5.74 ft2
|
55/ft2
|
764
|
5
|
Welding rod
|
25
|
2.5/rod
|
62.5
|
6
|
colour
|
250 ml
|
250/1000ml
|
62.5
|
7
|
Touchwood
|
250 ml
|
300/1000ml
|
75
|
8
|
Primer
|
250 ml
|
180/1000ml
|
45
|
9
|
Brush
|
2 (2 inch)
|
50
|
100
|
10
|
Thinner
|
250 ml
|
140/1000ml
|
35
|
Labour cost is 15% of total material cost
Labour cost = 1767 * 0.15
=Rs 265
Electricity cost is 10% of total material cost
Electricity cost = 1767 * 0.10
= Rs 178
Total cost = 1767+265+178
=Rs
2210
No comments:
Post a Comment